Representative Substation Projects

1 gradient aquare.png

This project involved the conversion of an existing 69kV AIS ring bus to a Siemens BAAH indoor GIS configuration within a highly constrained substation footprint. The upgrade enabled increased capacity, improved reliability, and optimized use of limited space.

​

Project Scope:

  • Conversion of existing 69kV AIS ring bus to 230kV indoor GIS configuration  bus to 230kV indoor GIS configuration

  • Installation of two new 230/69kV, 224 MVA power transformers

  • Design and integration of associated disconnect switches, instrument transformers, and structural supports 

  • Engineering of foundations and oil containment systems 

  • Design and construction of a new control house to support modern protection and control systems 

  • Development of detailed cutover sequencing and coordination with remote-end upgrades

  • Replacement of the existing fire pump house 

  • Installation of all required structural systems and foundations 

  • Completion of comprehensive electrical studies, including: 

    • Grounding analysis 

    • AC/DC system design 

    • Lightning protection 

    • Cable sizing and routing 
      ​

Key Outcomes:

  • Increased Capacity: Enabled integration of higher-voltage infrastructure and additional transformer capacity 

  • Optimized Footprint: Successfully delivered a high-density GIS solution within a space-constrained substation 

  • Enhanced Reliability: Improved system performance through modernized equipment and protection schemes 

  • Seamless Cutover Execution: Minimized operational disruptions through detailed planning and coordination 

  • Future-Ready Infrastructure: Established a scalable foundation for future system expansion and upgrades

Project: 230kV BAAH Indoor GIS Conversion

bottom of page