Project: Engineering & Design for 500kV & 230kV  – 15 Miles

Tier 1 provided comprehensive engineering design services and developed a complete construction package for the rebuild of a 15-mile transmission line.

​

Project Scope:

  • Northern corridor: Existing one 500 kV circuit and two 230 kV circuits on lattice towers replaced with two 500/230 kV double circuits, plus an additional 500 kV circuit for 8 miles on steel monopoles

  • Southern corridor: Existing one 500 kV circuit on lattice towers replaced with two 500 kV circuits on steel monopoles

  • Full engineering design for structural layouts, foundation design, and conductor configurations to meet loading and clearance requirements

 

Key Outcomes:

  • Upgraded corridor to support increased transmission capacity and reliability

  • Transitioned from lattice towers to steel monopoles for improved constructability, reduced footprint, and enhanced long-term maintainability

  • Delivered a construction package that optimized design efficiency while meeting safety and industry standards