Representative Transmission Projects

Project: Transmission Line Engineering & Design for 38kV – 68.6 Miles
Tier 1 delivered full engineering design services and developed a complete construction package for the rebuild of a 68.6-mile, 38kV transmission line.
Project Scope:
-
Civil plans for site access, staging areas, and foundations along the transmission corridor
-
Engineering for single- and double-circuit structures, including distribution and communication line underbuilds
-
Modeling and analysis of transmission lines using PLS-CADD to validate design criteria, including electrical clearances, structure loading, and stability requirements
-
Design of distribution underbuild consisting of approximately 1,100 poles
Key Outcomes:
-
Optimized line performance and structural reliability through advanced PLS-CADD modeling and analysis
-
Ensured compliance with electrical clearances and industry standards
-
Facilitated constructability with detailed civil and site access plans
-
Successfully integrated distribution and communication infrastructure without impacting transmission operation