Representative Distribution Projects

Tier 1 provided engineering and design services for the FEMA-funded hardening and reconstruction of approximately 7 miles of distribution backbone lines, enhancing system resilience against severe weather.
Project Scope:
-
Pole load analysis for existing and proposed structures using PLS-CADD
-
Reconductoring and system hardening for critical loads
Key Deliverables:
-
Detailed pole schedule
-
Bill of materials with long-lead items highlighted
-
Cost estimates
-
Primary single-line diagrams and plan views
-
Preliminary construction sequencing
-
Sag and tension reports
-
Pole load analysis summaries
-
Safety clearance evaluations
Key Outcomes:
-
Strengthened distribution backbone for improved storm resilience
-
Provided comprehensive, build-ready design package for efficient construction
-
Ensured safety and compliance with industry standards while protecting critical loads
Project: Feeder 2603-08, Storm Hardening