Representative Distribution Projects

Tier 1 provided engineering and design services for a new business distribution project, delivering a build-ready design package for seamless implementation.
Project Scope:
-
PVC duct installation (6–5” and 2–5”) connecting existing and new manholes to terminal poles
-
Dual-wheel switch installation in manholes
-
3-phase terminal pole with 600A disconnects
-
450’ extension of 4/0 AAC overhead primary
Key Outcomes:
-
Efficient and constructible duct and overhead routing
-
Compliance with utility standards and reliable system operation
-
Complete, ready-to-build design package
Project: New Business
Distribution